• Skip to primary navigation
  • Skip to main content
WITT Solutions Logo

WITT Solutions GmbH

SMARTE Messtechnik für Gleichstrom – Spannung – Kabel – Isolation

  • Products
    • DC-Traction power-Monitoring
    • WB measuring platform
      • Extensions for functional modules
    • Isolation-Monitoring
    • Voltage Limiting Device
    • Cable Monitoring
    • Railway Infrastructure
    • Mobile Measuring Systems
    • Stray currents measuring devices
    • Customized Products
  • Services
    • System Engineering
    • Substitution
    • Hardware Development
    • E-planning
    • Testing and system acceptance
    • Maintenance & Repair
    • Manufacture
    • Construction
    • CE conformity
  • Partner
    • International Sales Partner
    • Partner Q&A
  • About Us
    • WITT Solutions GmbH
    • Network
    • Honor
    • Research
    • Project
  • News
  • Career
  • Contact
    • General enquiries
    • Press Inquiry
  • German
  • English
  • Show Search
Hide Search

CE conformity

CE-Logo

In industry and in railway technology, there are plants and systems that were built before the introduction of the CE declaration of conformity. In the meantime, however, such systems are also required to have a CE declaration of conformity. _blank” rel=”noreferrer noopener”>prove.

WITT Solutions GmbH can support you in achieving CE conformity. Due to the many years of experience in the field of test bench and device construction, we are able to evaluate the current status of the system. In a second step, an action plan can be created and the implemented action plan checked again. The declaration can be made at the end with your own declaration or a declaration from a well-known testing institute.

WITT Solutions GmbH supports you in the following areas:

  • model-based system analysis and functionality
  • Verification of existing documents
  • Status-quo of current used hardware
  • Comparision of documents to existing hardware
  • CE-conformity check on hardware
  • Presentation of an action plan
  • (optional) Offer “Implementation of action plan”
  • Controll of implementation
  • electrical test according e.g. DIN/EN 61010
  • If required EMC-Test
  • declaration of conformity

Just give us a call or send us a message!

Footer

WITT Solutions GmbH

Dyrotzer Ring 3

14641 Wustermark near Berlin
Germany

Phone +49 33234 243 30
Fax +49 33234 243 302
 

© 2025 witt-solutions.de · WITT Solutions GmbH · Wustermark / Germany · GF Klaus Gradischek

Keep In Touch

  • Facebook
  • Instagram
  • LinkedIn
  • Twitter
  • YouTube
  • Contact
  • Privacy policy
  • Impressum
  • Career
  • General terms and conditions
  • Deutsch