Standards, monitoring and measurement data โ Traction Power 4.0
Innotrans 2026 is just round the corner and weโre absolutely delighted to welcome you to the WITT Solutions stand! Come and see our innovative systems that are shaping the future of tracktion power 4.0. With the WITT Bridge, weโll be showcasing exciting technologies that you can experience first-hand. Do pop by and be inspired!
22โ25 September 2026 ยท Berlin Exhibition Centre ยท Hall 11.1 ยท Stand 455
Your Path to Traction power 4.0

Innotrans dates
What to expect at the WITT Solutions stand
Systems, live and hands-on
Traction power supply systems & Traction Power 4.0
Why WITT Solutions
We specialise in DC measurement and control technology for energy supply and traction power systems.
Higher availability
Cable and voltage faults are detected before they lead to unplanned line closures.
Lower maintenance costs
Continuous condition monitoring rather than rigid, fixed inspection intervals.
Enhanced security
Early fault detection reduces risks in safety-critical rail infrastructure.
Compliance with standards and measurement data acquisition
Design based on EN 50122, EN 50526โ2 and the RAMS framework set out in EN 50126.